Joh. Johannson Kaffe A/S

Location: Vestby, Sweden
Coffee and cocoa: New coffee factory

3.850 m3 M3 33.5 m

Project details

In Vestby, just south of Oslo, TSC Silos has helped build a world first: a coffee roasting plant with ultra-low emissions. Among other things, the origin of all steel had to be proven in order to achieve the goal of a BREEAM Certificate of Excellence for the entire building. And that goal was achieved! In addition to a large storage capacity for both green and roasted coffee beans, all steel platforms and machine towers also made an emphatic mark on the production process.

Bins

82

Capacity

3.850 m3

Length

33.5

Width

28.0


Dennis Haman

Project Leader
“The special thing about this project was the diversity of work. Besides manufacturing and assembling the silo construction, we as TSC were responsible for the assembly of all steel constructions up to the packaging line. A choice made by the customer because, for safety reasons, they wanted to work with as few different assembly teams as possible. For us, a great project with a great result!”
Want to know more? Mail to d.haman@tsc-silos.com or Call with +31543729009
Related projects
Square silos for Delta Cafés

Delta Cafés

Delta Cafés
Location: Campo Maior, Portugal
Capacity: 700 m³
Coffee and cocoa: Green coffee beans
View project
700 M3 17.9 m
CK Coffee -siloblock for green coffee

CK Corporations

CK Corporations
Location: Chungcheongnam-do, South-Korea
Capacity: 200 m3
Coffee and cocoa: Green and roasted coffee beans
View project
200 M3 13.9 m
square silo for green coffee

Hollys Coffee

Hollys Coffee
Location: Seoul, South Korea
Capacity: 72 m3
Coffee and cocoa: Green and Roasted coffee beans
View project
72 M3 11.5 m
Less Cost Waste
More Result Sustainability

Procedure

Procedure The regulations of the industry, the properties of the material, the geographical conditions of the construction site, the weather conditions in the region… we leave nothing to chance. We therefore work according to the TSC roadmap. This way, we work efficiently and do not overlook any detail. A solid approach for a solid result.

Questions? Contact us
Customized silo in 7 steps
  • In the first step, we discuss the requirements, capacity needs, external conditions and preconditions. What challenges should we take into account. Result: a programme of requirements; our basis.
  • Our concrete advice for fulfilling the need. A construction concept, with a tailor-made proposal according to the programme of requirements, complete with a competitive offer and time schedule. Result: The start of our further cooperation.
  • Wind pressure, snow load, internal weight, regulations, process flow and other important starting points. Our designers make their calculations with these facts in mind. Result: a reliable construction calculation.
  • The new silo plant is now being designed down to the smallest detail and worked out in workshop drawings. All details are discussed together. Resulr: After your approval, we will start production.
  • Reliability is our most important pillar. Our construction planning is therefore well thought out. We take into account the transport route and its obstacles, the (often challenging) situation at the construction site and the local capacity. Result: final planning with delivery date.
  • Led by a TSC supervisor, our experienced assembly team gets to work. We keep in regular contact about the progress in the meantime. With knowledge of local regulations and the right permits, we work safely and competently. Result: A carefully constructed new silo ready for use!
  • Every completion is a moment of celebration. We are happy to evaluate the project together. Of course, because we want to see our work in action, but also to learn from practical experience and fine-tune details where necessary. Result: a long-term partnership.
Show actions