Hollys Coffee

Location: Seoul, South Korea
Coffee and cocoa: Green and Roasted coffee beans

72 M3 11.5 m

Project details

In the vibrant and famous Gangnam district in Seoul, South Korea, you will find the coffee roastery of Hollys Coffee. From here, Hollys supplies all their coffee shops in South Korea. To meet the growing demand and improve their production efficiency, Hollys Coffee decided to expand their existing facilities, determined to strengthen their leading position.

An important part of this expansion is the two square silo blocks provided by TSC. Both silo blocks consist of 10 cells. One serves as a storage facility for the green coffee beans, while the other is for the roasted coffee beans. They are also fully integrated into the coffee roasting process. Platforms have been installed on the top of each block to provide easy access to the rotary distributors. These distributors distribute the beans across the silo cells, determining the blends of Hollys Coffee.

Bins

20

Capacity

72 m3

Length

6.0 meter

Width

11.5 meter

Square silo block for green coffee
square silo for roasted coffee
square silo for green coffee
square silo block for green coffee

Gerwin Amtink

Project Leader
Want to know more? Mail to g.amtink@tsc-silos.com or Call with +31543729010
Related projects

Joh. Johannson Kaffe A/S

Joh. Johannson Kaffe A/S
Location: Vestby, Sweden
Capacity: 82 cells
Coffee and cocoa: New coffee factory
View project
3.850 m3 M3 33.5 m
Square silos for Delta Cafés

Delta Cafés

Delta Cafés
Location: Campo Maior, Portugal
Capacity: 700 m³
Coffee and cocoa: Green coffee beans
View project
700 M3 17.9 m
CK Coffee -siloblock for green coffee

CK Corporations

CK Corporations
Location: Chungcheongnam-do, South-Korea
Capacity: 200 m3
Coffee and cocoa: Green and roasted coffee beans
View project
200 M3 13.9 m
Less Cost Waste
More Result Sustainability

Procedure

Procedure The regulations of the industry, the properties of the material, the geographical conditions of the construction site, the weather conditions in the region… we leave nothing to chance. We therefore work according to the TSC roadmap. This way, we work efficiently and do not overlook any detail. A solid approach for a solid result.

Questions? Contact us
Customized silo in 7 steps
  • In the first step, we discuss the requirements, capacity needs, external conditions and preconditions. What challenges should we take into account. Result: a programme of requirements; our basis.
  • Our concrete advice for fulfilling the need. A construction concept, with a tailor-made proposal according to the programme of requirements, complete with a competitive offer and time schedule. Result: The start of our further cooperation.
  • Wind pressure, snow load, internal weight, regulations, process flow and other important starting points. Our designers make their calculations with these facts in mind. Result: a reliable construction calculation.
  • The new silo plant is now being designed down to the smallest detail and worked out in workshop drawings. All details are discussed together. Resulr: After your approval, we will start production.
  • Reliability is our most important pillar. Our construction planning is therefore well thought out. We take into account the transport route and its obstacles, the (often challenging) situation at the construction site and the local capacity. Result: final planning with delivery date.
  • Led by a TSC supervisor, our experienced assembly team gets to work. We keep in regular contact about the progress in the meantime. With knowledge of local regulations and the right permits, we work safely and competently. Result: A carefully constructed new silo ready for use!
  • Every completion is a moment of celebration. We are happy to evaluate the project together. Of course, because we want to see our work in action, but also to learn from practical experience and fine-tune details where necessary. Result: a long-term partnership.