Delta Cafés

Location: Campo Maior, Portugal
Coffee and cocoa: Green coffee beans

700 M3 17.9 m

Project details

Maximum flexibility. That’s what Delta Cafés owner, Grupo Nabeiro, had in mind for their new green coffee silo block on their premises in Campo Maior. It resulted in a TSC Silos design with 44 bins,  in three different sizes, integrated into a superstructure with stairways and platforms for the turn head distributors. The striking color of the steel structure leaves no questions on what product is processed: green coffee beans. With the cladding included in the scope of supply, it was another project including TSC’s full product portfolio.

Bins

44

Capacity

700 m³

Length

20.0 meter

Width

11.0 meter

Square silos for Delta Cafés
Can-do mentality despite unprecedented challenges

Dennis Haman

Project Leader
A very nice project that we constructed amid the pandemic and summer heat of 2020. Despite the restrictions in place we were able to erect this square silo building very smoothly, thanks to the open communication and 'can-do' mentality of everyone involved. So a very big compliment to the whole project team.
Want to know more? Mail to d.haman@tsc-silos.com or Call with +31543729009
Related projects
square silo for green coffee

Hollys Coffee

Hollys Coffee
Location: Seoul, South Korea
Capacity: 72 m3
Coffee and cocoa: Green and Roasted coffee beans
View project
72 M3 11.5 m

Joh. Johannson Kaffe A/S

Joh. Johannson Kaffe A/S
Location: Vestby, Sweden
Capacity: 82 cells
Coffee and cocoa: New coffee factory
View project
3.850 m3 M3 33.5 m
CK Coffee -siloblock for green coffee

CK Corporations

CK Corporations
Location: Chungcheongnam-do, South-Korea
Capacity: 200 m3
Coffee and cocoa: Green and roasted coffee beans
View project
200 M3 13.9 m
Less Cost Waste
More Result Sustainability

Procedure

Procedure The regulations of the industry, the properties of the material, the geographical conditions of the construction site, the weather conditions in the region… we leave nothing to chance. We therefore work according to the TSC roadmap. This way, we work efficiently and do not overlook any detail. A solid approach for a solid result.

Questions? Contact us
Customized silo in 7 steps
  • In the first step, we discuss the requirements, capacity needs, external conditions and preconditions. What challenges should we take into account. Result: a programme of requirements; our basis.
  • Our concrete advice for fulfilling the need. A construction concept, with a tailor-made proposal according to the programme of requirements, complete with a competitive offer and time schedule. Result: The start of our further cooperation.
  • Wind pressure, snow load, internal weight, regulations, process flow and other important starting points. Our designers make their calculations with these facts in mind. Result: a reliable construction calculation.
  • The new silo plant is now being designed down to the smallest detail and worked out in workshop drawings. All details are discussed together. Resulr: After your approval, we will start production.
  • Reliability is our most important pillar. Our construction planning is therefore well thought out. We take into account the transport route and its obstacles, the (often challenging) situation at the construction site and the local capacity. Result: final planning with delivery date.
  • Led by a TSC supervisor, our experienced assembly team gets to work. We keep in regular contact about the progress in the meantime. With knowledge of local regulations and the right permits, we work safely and competently. Result: A carefully constructed new silo ready for use!
  • Every completion is a moment of celebration. We are happy to evaluate the project together. Of course, because we want to see our work in action, but also to learn from practical experience and fine-tune details where necessary. Result: a long-term partnership.