CK Corporations

Location: Chungcheongnam-do, South-Korea
Coffee and cocoa: Green and roasted coffee beans

200 M3 13.9 m

Project details

CK Corporations is a leading South Korean coffee roaster. Since its establishment in 2004, the company has experienced substantial growth. This is partly due to the company’s focus on the coffee experience rather than just the coffee product itself.

Of course, coffee is the heart of CK Corporations. To facilitate its growth, it was decided in 2019 to expand significantly. Production had to be increased to 9,000 tons of roasted coffee beans annually, making it the most significant coffee roaster in Korea. TSC provided the square silo blocks for the green and roasted coffee beans. A total of 52 silo cells were installed across the two blocks, including all necessary steel structures to facilitate the process. The robust construction and high-quality materials provide a safe and controlled storage environment for coffee beans.

Additionally, the silo blocks are efficiently designed to optimize space utilization. This allows CK Corporation to store a significant amount of coffee beans while maximizing the available space. This contributes to a streamlined logistics process and helps CK Corporations meet the growing demand for their coffee products.

Bins

52

Capacity

200 m3

Length

13.9 meter

Width

2 x 7.5 meter

square silos for CK Corporations coffee beans
TSC Silos for CK Corporations
CK Corporations -siloblock for green coffee

Gerwin Amtink

Project Leader
Want to know more? Mail to g.amtink@tsc-silos.com or Call with +31543729010
Related projects

Joh. Johannson Kaffe A/S

Joh. Johannson Kaffe A/S
Location: Vestby, Norway
Capacity: 82 cells
Coffee and cocoa: New coffee factory
View project
3.850 m3 M3 33.5 m
square silo for green coffee

Hollys Coffee

Hollys Coffee
Location: Seoul, South Korea
Capacity: 72 m3
Coffee and cocoa: Green and Roasted coffee beans
View project
72 M3 11.5 m
Square silos for Delta Cafés

Delta Cafés

Delta Cafés
Location: Campo Maior, Portugal
Capacity: 700 m³
Coffee and cocoa: Green coffee beans
View project
700 M3 17.9 m
Less Cost Waste
More Result Sustainability

Procedure

Procedure The regulations of the industry, the properties of the material, the geographical conditions of the construction site, the weather conditions in the region… we leave nothing to chance. We therefore work according to the TSC roadmap. This way, we work efficiently and do not overlook any detail. A solid approach for a solid result.

Questions? Contact us
Customized silo in 7 steps
  • In the first step, we discuss the requirements, capacity needs, external conditions and preconditions. What challenges should we take into account. Result: a programme of requirements; our basis.
  • Our concrete advice for fulfilling the need. A construction concept, with a tailor-made proposal according to the programme of requirements, complete with a competitive offer and time schedule. Result: The start of our further cooperation.
  • Wind pressure, snow load, internal weight, regulations, process flow and other important starting points. Our designers make their calculations with these facts in mind. Result: a reliable construction calculation.
  • The new silo plant is now being designed down to the smallest detail and worked out in workshop drawings. All details are discussed together. Resulr: After your approval, we will start production.
  • Reliability is our most important pillar. Our construction planning is therefore well thought out. We take into account the transport route and its obstacles, the (often challenging) situation at the construction site and the local capacity. Result: final planning with delivery date.
  • Led by a TSC supervisor, our experienced assembly team gets to work. We keep in regular contact about the progress in the meantime. With knowledge of local regulations and the right permits, we work safely and competently. Result: A carefully constructed new silo ready for use!
  • Every completion is a moment of celebration. We are happy to evaluate the project together. Of course, because we want to see our work in action, but also to learn from practical experience and fine-tune details where necessary. Result: a long-term partnership.
Show actions

Contact