DLG Skave

Location: Skave, Denmark
Animal feed: Expanding capacity

2.400 M3 27.4 m

Project details

In the Danish town of Skave, TSC built a new silo for the company DLG. DLG is expanding considerably at this location, eventually doubling the available production capacity. In order to safeguard its production process, DLG requires a higher storage capacity for the various raw materials. For this project, TSC delivered and assembled the silo, from steel construction to cladding. A beautiful project in a wonderful location in Denmark!

Bins

21

Capacity

2.400

Length

20.5

Width

9.75

DLG Skave

Harm-Jan Wieskamp

Account Manager
The project for DLG in Skave was part of a double project for DLG. Besides this extension in Skave, there was also an extension for DLG in Vrå. These two projects were built in immediate succession, 2 hours' drive apart in the north of Denmark. For me personally, they were my first completely independently sold projects for TSC. I supervised these projects from the first meeting to completion.
Want to know more? Call with +31621946608
Related projects
Havens Diervoeders square silos overview

Havens Diervoeders

Havens Diervoeders
Location: Maashees, The Netherlands
Capacity: 10.500 m³
Animal feed: Raw materials and finished product
View project
10.500 M3 32.30 m

Carra Mangimi S.p.A.

Carra Mangimi S.p.A.
Location: Bogolese di Sorbolo, Italia
Capacity: 14
Animal feed: Dosing block
View project
2.200 M3 27.5 m

Geissbühler Mühle

Geissbühler Mühle
Location: Oberhünigen, Switzerland
Capacity: 1.230 m3
Animal feed: Raw materials and finished products
View project
1.230 M3 18.32 m
ABZ Eindhoven - square silos frontview

ABZ Diervoeding

ABZ Diervoeding
Location: Eindhoven, The Netherlands
Capacity: 2.950 m3
Animal feed: Raw materials and dosing
View project
2.950 M3 47.7 m
Het eerste blok staat, de staalconstructie wordt opgetrokken.

Gebrs. Fuite

Gebrs. Fuite
Location: Gebr. Fuite, Genemuiden The Netherlands
Capacity: 53 cells
Animal feed: Expanding feed mill
View project
10.000 M3 25.0 m

Patent Co.

Patent Co.
Location: Mišićevo, Serbia
Capacity: 90 cells
Animal feed: Feed mill
View project
7.500 M3 27.6 m
Een prachtig aanblik van de nieuwe fabriek in Jeddah.

Fakieh Poultry

Fakieh Poultry
Location: Jeddah, Saudi Arabia
Capacity: 8.100 m³
Animal feed: New fabric
View project
8.100 m³ M3 19.0 m
Een blik op de bouwlocatie van Leitzach-Mühle.

Leitzachmühle

Leitzachmühle
Location: Miesbach, Germany
Capacity: 20
Animal feed: Dosing block and finished products
View project
1.380 M3 28.0 m

Inversiones Avicolas de honduras S.A.

Inversiones Avicolas de honduras S.A.
Location: San Buenvaventura, Honduras
Animal feed: Raw materials and finished product
View project
1150 M3 15.25 m
Less Cost Waste
More Result Sustainability

Procedure

Procedure The regulations of the industry, the properties of the material, the geographical conditions of the construction site, the weather conditions in the region… we leave nothing to chance. We therefore work according to the TSC roadmap. This way, we work efficiently and do not overlook any detail. A solid approach for a solid result.

Questions? Contact us
Customized silo in 7 steps
  • In the first step, we discuss the requirements, capacity needs, external conditions and preconditions. What challenges should we take into account. Result: a programme of requirements; our basis.
  • Our concrete advice for fulfilling the need. A construction concept, with a tailor-made proposal according to the programme of requirements, complete with a competitive offer and time schedule. Result: The start of our further cooperation.
  • Wind pressure, snow load, internal weight, regulations, process flow and other important starting points. Our designers make their calculations with these facts in mind. Result: a reliable construction calculation.
  • The new silo plant is now being designed down to the smallest detail and worked out in workshop drawings. All details are discussed together. Resulr: After your approval, we will start production.
  • Reliability is our most important pillar. Our construction planning is therefore well thought out. We take into account the transport route and its obstacles, the (often challenging) situation at the construction site and the local capacity. Result: final planning with delivery date.
  • Led by a TSC supervisor, our experienced assembly team gets to work. We keep in regular contact about the progress in the meantime. With knowledge of local regulations and the right permits, we work safely and competently. Result: A carefully constructed new silo ready for use!
  • Every completion is a moment of celebration. We are happy to evaluate the project together. Of course, because we want to see our work in action, but also to learn from practical experience and fine-tune details where necessary. Result: a long-term partnership.