Inversiones Avicolas de honduras S.A.

Location: San Buenvaventura, Honduras
Animal feed: Raw materials and finished product

1150 M3 15.25 m

Project details

In San Buenaventura in western Honduras, TSC delivered the storage cells for Inversiones Avicolas de Honduras S.A. (Inavih for short) for the newly built poultry feed plant. The delivery consisted of a dosing block and a finished product block. In which TSC supplied the supporting steel structure, hoppers, smooth walls and bin roof. In addition, TSC performed part of the engineering of the intermediate steel construction. This allowed the best possible integration and connecting of the containerised feedmill with our silo structures. Over the entire project, this provides a nice savings in the steel needed.

Bins

32

Capacity

1.150m³

Length

18.0 meter

Width

10.0 meter

Inavih Honduras

Daan van Kempen

Account Manager
For Inversiones Avicolas de Honduras S.A. in San Buenaventura, we were allowed to deliver two beautiful silo blocks. The blocks were part of a containerized poultry feed plant. Our additional added value was in integrating the loads of the intermediate steel structures into our constructions.
Want to know more? Mail to d.vankempen@tsc-silos.com or Call with +31683623602
Related projects

Geissbühler Mühle

Geissbühler Mühle
Location: Oberhünigen, Switzerland
Capacity: 1.230 m3
Animal feed: Raw materials and finished products
View project
1.230 M3 18.32 m
Een prachtig aanblik van de nieuwe fabriek in Jeddah.

Fakieh Poultry

Fakieh Poultry
Location: Jeddah, Saudi Arabia
Capacity: 8.100 m³
Animal feed: New fabric
View project
8.100 m³ M3 19.0 m

Carra Mangimi S.p.A.

Carra Mangimi S.p.A.
Location: Bogolese di Sorbolo, Italia
Capacity: 14
Animal feed: Dosing block
View project
2.200 M3 27.5 m
Een blik op de bouwlocatie van Leitzach-Mühle.

Leitzachmühle

Leitzachmühle
Location: Miesbach, Germany
Capacity: 20
Animal feed: Dosing block and finished products
View project
1.380 M3 28.0 m

DLG Skave

DLG Skave
Location: Skave, Denmark
Capacity: 21
Animal feed: Expanding capacity
View project
2.400 M3 27.4 m
Het eerste blok staat, de staalconstructie wordt opgetrokken.

Gebrs. Fuite

Gebrs. Fuite
Location: Gebr. Fuite, Genemuiden The Netherlands
Capacity: 53 cells
Animal feed: Expanding feed mill
View project
10.000 M3 25.0 m

Patent Co.

Patent Co.
Location: Mišićevo, Serbia
Capacity: 90 cells
Animal feed: Feed mill
View project
7.500 M3 27.6 m
ABZ Eindhoven - square silos frontview

ABZ Diervoeding

ABZ Diervoeding
Location: Eindhoven, The Netherlands
Capacity: 2.950 m3
Animal feed: Raw materials and dosing
View project
2.950 M3 47.7 m
Havens Diervoeders square silos overview

Havens Diervoeders

Havens Diervoeders
Location: Maashees, The Netherlands
Capacity: 10.500 m³
Animal feed: Raw materials and finished product
View project
10.500 M3 32.30 m
Less Cost Waste
More Result Sustainability

Procedure

Procedure The regulations of the industry, the properties of the material, the geographical conditions of the construction site, the weather conditions in the region… we leave nothing to chance. We therefore work according to the TSC roadmap. This way, we work efficiently and do not overlook any detail. A solid approach for a solid result.

Questions? Contact us
Customized silo in 7 steps
  • In the first step, we discuss the requirements, capacity needs, external conditions and preconditions. What challenges should we take into account. Result: a programme of requirements; our basis.
  • Our concrete advice for fulfilling the need. A construction concept, with a tailor-made proposal according to the programme of requirements, complete with a competitive offer and time schedule. Result: The start of our further cooperation.
  • Wind pressure, snow load, internal weight, regulations, process flow and other important starting points. Our designers make their calculations with these facts in mind. Result: a reliable construction calculation.
  • The new silo plant is now being designed down to the smallest detail and worked out in workshop drawings. All details are discussed together. Resulr: After your approval, we will start production.
  • Reliability is our most important pillar. Our construction planning is therefore well thought out. We take into account the transport route and its obstacles, the (often challenging) situation at the construction site and the local capacity. Result: final planning with delivery date.
  • Led by a TSC supervisor, our experienced assembly team gets to work. We keep in regular contact about the progress in the meantime. With knowledge of local regulations and the right permits, we work safely and competently. Result: A carefully constructed new silo ready for use!
  • Every completion is a moment of celebration. We are happy to evaluate the project together. Of course, because we want to see our work in action, but also to learn from practical experience and fine-tune details where necessary. Result: a long-term partnership.
Show actions

Contact