De Heus LLC

Location: Ving Long, Vietnam
Aqua feed: Dosing

2.125 M3 30.5 m

Project details

TSC delivered the materials for the construction of a fish feed factory for De Heus LLC in Vietnam. The factory has a storage of 2.125 m3 divided over 30 cells.

Bins

30

Capacity

2.125 m3

Length

23.0 meter

Width

17.0 meter


Harm-Jan Wieskamp

Account Manager
Want to know more? Call with +31621946608
Related projects
TSC - BioMar

BioMar Australia

BioMar Australia
Location: Wesley Vale, Tasmania, Australia
Capacity: 2.900 m³
Aqua feed: Dosing
View project
2.900 M3 29.8 m
Less Cost Waste
More Result Sustainability

Procedure

Procedure The regulations of the industry, the properties of the material, the geographical conditions of the construction site, the weather conditions in the region… we leave nothing to chance. We therefore work according to the TSC roadmap. This way, we work efficiently and do not overlook any detail. A solid approach for a solid result.

Questions? Contact us
Customized silo in 7 steps
  • In the first step, we discuss the requirements, capacity needs, external conditions and preconditions. What challenges should we take into account. Result: a programme of requirements; our basis.
  • Our concrete advice for fulfilling the need. A construction concept, with a tailor-made proposal according to the programme of requirements, complete with a competitive offer and time schedule. Result: The start of our further cooperation.
  • Wind pressure, snow load, internal weight, regulations, process flow and other important starting points. Our designers make their calculations with these facts in mind. Result: a reliable construction calculation.
  • The new silo plant is now being designed down to the smallest detail and worked out in workshop drawings. All details are discussed together. Resulr: After your approval, we will start production.
  • Reliability is our most important pillar. Our construction planning is therefore well thought out. We take into account the transport route and its obstacles, the (often challenging) situation at the construction site and the local capacity. Result: final planning with delivery date.
  • Led by a TSC supervisor, our experienced assembly team gets to work. We keep in regular contact about the progress in the meantime. With knowledge of local regulations and the right permits, we work safely and competently. Result: A carefully constructed new silo ready for use!
  • Every completion is a moment of celebration. We are happy to evaluate the project together. Of course, because we want to see our work in action, but also to learn from practical experience and fine-tune details where necessary. Result: a long-term partnership.