Location: Presov, Slovakia
Aqua feed: Raw material storage
For Biofer, TSC expanded the raw material storage capacity by adding ten silo cells. Due to the dimensions of the silo block, it was decided to deliver it partially pre-assembled. The steel structure, hoppers, lower wall sections and slanting plates were assembled during production and then painted as a single unit. The main advantages were the shorter installation time and the relocation of all welding activities to during production, allowing the entire on-site installation to be carried out using only bolts and nuts.
I went to Slovakia to take a look during the assembly of this project. The complete silo block was constructed in less than three days. This caused minimal disruption to Biofer's production process. What I like most about this project is that it is a good example of how flexible our silo system is, from small cells like this one to large silo blocks with hundreds of cubic meters per cell; anything is possible!
Procedure The regulations of the industry, the properties of the material, the geographical conditions of the construction site, the weather conditions in the region… we leave nothing to chance. We therefore work according to the TSC roadmap. This way, we work efficiently and do not overlook any detail. A solid approach for a solid result.
Questions? Contact us